Quang Nam has 5 more small and medium-sized hydropower projects

Thứ tư, 26/12/2007 | 00:00 GMT+7
On December 25, People Committee of Quang Nam has already ratified the investment plan for 5 small and medium-sized projects.
The projects consist of Tra Leng Hydropower No.1 Project with the installed capacity of 7.5 MW, Tra Leng Hydropower No.2 Project (Tra Leng – Southern Tra My) with the installed capacity of 8 MW, Dak Pring Hydropower No.2 Project (Cha Val – Nam Giang) with the installed capacity of 5.4 MW; Dak Se Hydropower No.2 Project (Phuoc My – Phuoc Son) with the installed capacity of 2 MW, and Bong Mieu Hydropower Project (Tam Lanh – Phu Ninh) with the total capacity of 0.6 MW.
These are hydropower projects to serve for the population’s consumption and socio-economic development for citizens on high land in Quang Nam.
From People Police