The order includes an EPC (Engineering, Procurement and Construction) contract for the construction of a new 400 MW gas-fired combined cycle power plant CCP5, as well as a six-year maintenance contract.
Under the terms and conditions of the EPC contract, Alstom will provide the entire power plant and all associated equipment, including a GT26 gas turbine, steam turbine and heat recovery steam generator. Alstom’s combined cycle technology, based on its GT26 gas turbine, is among the most efficient and reliable technologies currently available.
The completion of CCP5 in 2014 will enable TPG to improve the overall electricity generating efficiency of its plant portfolio.
“This is Alstom’s first contract with TPG, which represents a major breakthrough and is proof of our competitiveness,” said Philippe Joubert, President of Alstom Power. “By selecting us as their partner, TPG has given a strong indication of their confidence in the quality and reliability of Alstom’s products.”
About Alstom
Alstom is a global leader in the world of power generation, power transmission and rail infrastructure and sets the benchmark for innovative and environmentally friendly technologies. Alstom builds the fastest train and the highest capacity automated metro in the world, provides turnkey integrated power plant solutions and associated services for a wide variety of energy sources, including hydro, nuclear, gas, coal and wind, and it offers a wide range of solutions for power transmission, with a focus on smart grids. The Group employs 96,500 people in more than 70 countries, and had sales of over €23 billion* in 2009/10.
|