EVNHCMC energizes and puts into operation the "Renovating 110kV branch of Intel substation" project

Thứ sáu, 25/11/2022 | 15:58 GMT+7
Ho Chi Minh City Power Corporation (EVNHCMC) has just successfully energized phase 2 of the project "Renovating 110kV branch of Intel substation", contributing to improving the power supply quality to Intel Products Vietnam’s factory at Ho Chi Minh City Hi-Tech Park.
EVNHCMC testing equipment system of the project “Renovating 110kV branch of Intel substation” before putting it into operation.
 
The project "Renovating 110kV branch of Intel substation" has a single line length of about 0.72 km, with a total investment of more than VND 33 billion. Previously, on 30 October 2022, EVNHCMC successfully energized phase 1 of this project.
 
The timely completion of the project not only contributes to enhancing the power supply capacity for Intel 110kV Substation and neighboring substations but also helps to reduce power loss on the transmission grid, increasing the stability of the HCMC power system.
 
The Intel Products Vietnam factory is the largest manufacturing, assembly and testing facility in Intel's assembly and testing network. Ensuring stable and uninterrupted power supply for Intel Products Vietnam and key enterprises in Ho Chi Minh City hi-tech park has been identified as one of the top key tasks by EVNHCMC to contribute to improving the investment environment of Ho Chi Minh City.
Sounce: EVN